On the DEEP DRILLER, when using the starboard #2 ballast pump to provide water to the main deck from the sea, it is necessary to open valves _______________.
AI Explanation
The correct answer is C) 37, 35, 36, 45.
To provide water to the main deck from the sea using the starboard #2 ballast pump on the DEEP DRILLER, the valves that need to be opened are 37, 35, 36, and 45. This sequence allows the water to be drawn from the sea, pass through the ballast pump, and be delivered to the main deck.
The other answer options are incorrect because:
A) and B) do not include the necessary valve 35 in the sequence.
D) is missing several valves required to complete the full flow path.
Related Questions
#4338 A non-symmetrical tank aboard a MODU contains 390 tons of ballast at a VCG of 9.85 feet. Ballast weighing 250 tons and a VCG of 12.0 feet is discharged. The vertical moments for the remaining ballast is _______________.#4339 While loaded as shown in the COASTAL DRILLER Sample Load Form #3 (Drilling), 236 kips are discharged from 80 feet AF0 and 19.79 feet to port of the centerline. What is the resulting starboard leg reaction? #4341 For a jack-up, the angle of maximum stability corresponds approximately to the angle of _______________.#4342 What port-side valves must be open to transfer ballast from Tank 1P to Tank 10P on the DEEP DRILLER using the Port #1 ballast pump? #4343 A semisubmersible is more likely to experience structural stresses during heavy weather when _______________.