Coast Guard Exams
Home/Questions/Deck Safety/Question 2263
Question 2263Deck Safety70% to pass

You are loading in a port subject to the tropical load line mark and bound for a port subject to the winter load line mark. You will enter the summer zone after steaming one and one-half days, and you will enter the winter zone after a total of six days. You will consume 29 tons of fuel, water, and stores per day. The hydrometer reading at the loading pier is 1.006, and the average TPI is 43. What is the minimum freeboard required at the start of the voyage? Reference Table BL-0008 below.

Diagram for question 2263
AI Explanation
The correct answer is B) 76.5 inches. The minimum freeboard required at the start of the voyage is determined by the load line regulations, specifically the winter load line mark. Since the vessel will be entering the winter zone after a total of six days, the winter load line mark is the governing factor. According to the information provided in Table BL-0008, the minimum freeboard required for a vessel bound from a port subject to the tropical load line mark to a port subject to the winter load line mark is 76.5 inches. The other options are incorrect because they do not match the minimum freeboard requirement for the given voyage parameters.

Related Questions

#2261 You are loading in a port subject to the winter load line mark and bound for a port subject to the tropical load line mark. You will enter the summer zone after steaming four days, and you will enter the tropical zone after a total of seven days. You will consume 38 tons of fuel, water, and stores per day. The hydrometer reading at the loading pier is 1.004, and the average TPI is 72. What is the minimum freeboard required at the start of the voyage? Reference Table BL-0007 below. #2262 You are loading in a port subject to the tropical load line mark and bound for a port subject to the winter load line mark. You will enter the summer zone after steaming one day, and you will enter the winter zone after a total of eight days. You will consume 36 tons of fuel, water, and stores per day. The hydrometer reading at the loading pier is 1.002, and the TPI is 47. What is the minimum freeboard required at the start of the voyage? Reference Table BL-0005 below. #2264 You are loading in a port subject to the summer load line mark and bound for a port subject to the tropical load line mark. You will enter the tropical zone after steaming four days. You will consume 33 tons of fuel, water, and stores per day. The hydrometer reading at the loading pier is 1.006, and the average TPI is 66. What is the minimum freeboard required at the start of the voyage? Reference Table BL-0022 below. #2265 You are loading in a port subject to the tropical load line mark and bound for a port subject to the summer load line mark. You will enter the summer zone after steaming two days. You will consume 28 tons of fuel, water, and stores per day. The hydrometer reading at the loading pier is 1.020, and the average TPI is 55. What is the minimum freeboard required at the start of the voyage? Reference Table BL-0021 below. #2266 Your vessel has a forward draft of 26'-11" and an after draft of 29'-07". How many tons of cargo can be loaded before the vessel reaches a mean draft of 28'-06" if the TPI is 69?

Ready to test your knowledge?