Before a plan can be effectively executed, the objective of the plan must be defined. What statement concerning the definition of a plan objective best represents the proper writing of an objective as an engineering department management level officer?
AI Explanation
The correct answer is B) Reduce overtime expenditures department-wide for all engineering department employees 10% for the upcoming deployment as compared to the last trip.
This is the correct answer because a well-defined plan objective should be specific, measurable, achievable, relevant, and time-bound (SMART). Option B meets these criteria - it specifies the target (reduce overtime expenditures), the scope (department-wide for all engineering department employees), the measurable amount (10%), the timeframe (for the upcoming deployment), and the basis for comparison (as compared to the last trip).
The other options are less specific or lack one or more of the SMART criteria. Option A does not include a measurable target. Option C does not specify the scope or base it on a comparison. Option D does not include a timeframe or basis for comparison.
Related Questions
#363 A periodic hydrostatic test is being performed on an oil-fired auxiliary water-tube boiler with a maximum allowable working pressure of 150 psig. In accordance with 46 CFR 61, what is the required hydrostatic test pressure for this procedure? #364 Which of the following document types would offer the greatest flexibility in carrying out its intent? #366 For planning purposes graphical charts can be a useful tool. What type of chart is good for a visual progress report and identifies work stages or activities on the vertical axis and the scheduled completion dates on the horizontal axis? #367 According to 46 CFR regulations pertaining to tests and inspections as related to automatic auxiliary boilers, the draft limit control must be checked for proper operation. What statement is true? #368 According to 46 CFR regulations pertaining to tests and inspections as related to automatic auxiliary boilers, the fuel supply control solenoids must be checked for proper shutdown operation. What must be checked for?