Question 368General Subjects - 1st Asst/Chief70% to pass
According to 46 CFR regulations pertaining to tests and inspections as related to automatic auxiliary boilers, the fuel supply control solenoids must be checked for proper shutdown operation. What must be checked for?
AI Explanation
The correct answer is D) Upon a normal cycling or safety shutdown, the fuel control solenoid valve coil under test closes with no visible leakage into the burner(s).
This is the correct answer because according to 46 CFR regulations, the fuel supply control solenoids must be checked to ensure that they properly shut off the fuel supply during a normal cycling or safety shutdown. Specifically, the regulations require that the solenoid valve physically closes and seals to prevent any leakage of fuel into the burner(s), which could create a safety hazard. Options A, B, and C do not fully address this key requirement of no visible leakage after the solenoid valve has closed.
Related Questions
#366 For planning purposes graphical charts can be a useful tool. What type of chart is good for a visual progress report and identifies work stages or activities on the vertical axis and the scheduled completion dates on the horizontal axis? #367 According to 46 CFR regulations pertaining to tests and inspections as related to automatic auxiliary boilers, the draft limit control must be checked for proper operation. What statement is true? #369 According to 46 CFR regulations pertaining to tests and inspections as related to automatic auxiliary boilers, the fuel pressure limit control must be checked for proper shutdown operation. What statement is true? #370 According to 46 CFR regulations pertaining to tests and inspections as related to automatic auxiliary boilers burning heavy fuel oil, the fuel temperature limit control must be checked for proper shutdown operation. What statement is true? #371 According to 46 CFR regulations pertaining to periodic tests and inspections as related to automatic auxiliary boilers, flame safeguard controls must be checked for proper shutdown operation. Which of the following must be checked? 1