Question 369General Subjects - 1st Asst/Chief70% to pass
According to 46 CFR regulations pertaining to tests and inspections as related to automatic auxiliary boilers, the fuel pressure limit control must be checked for proper shutdown operation. What statement is true?
AI Explanation
The correct answer is C.
According to 46 CFR regulations, to initiate a safety shutdown on an automatic auxiliary boiler, the fuel pressure must be lowered to a value below what is required for safe combustion. After the safety shutdown, a manual reset must be required before the boiler can be restarted. This ensures that the boiler system is thoroughly checked and reset before resuming operation, enhancing safety.
The other options are incorrect because they do not accurately reflect the regulatory requirements. Raising the fuel pressure above the safe limit (option A), or automatically restarting the boiler after a shutdown (options A and D), would not provide the necessary safety checks and controls required by the regulations.
Related Questions
#367 According to 46 CFR regulations pertaining to tests and inspections as related to automatic auxiliary boilers, the draft limit control must be checked for proper operation. What statement is true? #368 According to 46 CFR regulations pertaining to tests and inspections as related to automatic auxiliary boilers, the fuel supply control solenoids must be checked for proper shutdown operation. What must be checked for? #370 According to 46 CFR regulations pertaining to tests and inspections as related to automatic auxiliary boilers burning heavy fuel oil, the fuel temperature limit control must be checked for proper shutdown operation. What statement is true? #371 According to 46 CFR regulations pertaining to periodic tests and inspections as related to automatic auxiliary boilers, flame safeguard controls must be checked for proper shutdown operation. Which of the following must be checked? 1 #372 According to 46 CFR regulations pertaining to periodic tests and inspections as related to automatic auxiliary boilers, safety programming controls must be checked for proper operation, sequencing, and timing. What functions must be checked?