Question 4296Deck General70% to pass
During preloading or elevating the COASTAL DRILLER, jacking-up may continue if the total weight is less than _______________.
AI Explanation
The correct answer is D) 14,400 kips.
According to the US Coast Guard regulations for Captain's License Examinations, jacking-up of the COASTAL DRILLER can continue if the total weight is less than 14,400 kips. This limit is in place to ensure the stability and safety of the vessel during the preloading or elevating process. The other options are incorrect because they do not align with the relevant regulation.
Related Questions
#4294 Starboard ballast pump #1 on the DEEP DRILLER has failed. To deballast from tank C2SA using starboard ballast pump #2, it is necessary to open the manual valve and which motor driven valves? #4295 During a storm, the chance of fatigue failure of a mooring line will increase as _______________.#4297 While loaded as shown in the COASTAL DRILLER sample load form #3 (drilling), 200 kips are discharged from 60 feet AF0 and 30 feet to starboard of the centerline. What is the starboard leg reaction? #4298 What should be done after repairing a surface crack on a link of anchor chain by grinding? #4299 Prior to magnetic particle inspection of anchor chain, the chain should be _______________.