Question 4299Deck General70% to pass
Prior to magnetic particle inspection of anchor chain, the chain should be _______________.
AI Explanation
The correct answer is B) sandblasted.
Prior to conducting a magnetic particle inspection on an anchor chain, the chain should be sandblasted to remove any rust, paint, or other surface contaminants. This allows the magnetic particles used in the inspection process to properly adhere to any cracks or defects in the chain, enabling a thorough and accurate inspection.
The other options are incorrect because:
A) Soaking the chain would not adequately prepare the surface for the inspection.
C) Demagnetizing the chain is not necessary before the magnetic particle inspection.
D) Degaussing, which removes a magnetic field, is also not required prior to this type of inspection.
Related Questions
#4297 While loaded as shown in the COASTAL DRILLER sample load form #3 (drilling), 200 kips are discharged from 60 feet AF0 and 30 feet to starboard of the centerline. What is the starboard leg reaction? #4298 What should be done after repairing a surface crack on a link of anchor chain by grinding? #4300 On the DEEP DRILLER, among the starboard-side valves to open when flooding through the overboard discharge into ballast tank 1S is valve _______________.#4301 When taking soundings on a MODU, coating the tape with chalk helps to _______________.#4302 The DEEP DRILLER is loaded as shown in Sample Load Form #4 (Drilling). While the unit is deballasting, starboard valve 17 fails in the closed position. You may deballast from tank 8S by pumping from tank 9S and opening valves 18 and _______________.