Question 4300Deck General70% to pass
On the DEEP DRILLER, among the starboard-side valves to open when flooding through the overboard discharge into ballast tank 1S is valve _______________.
AI Explanation
The correct answer is A) 2.
When flooding through the overboard discharge into ballast tank 1S on the DEEP DRILLER, valve 2 on the starboard side needs to be opened. This is based on the design and configuration of the vessel's flooding and ballast control systems, which are critical knowledge for Coast Guard license exams.
The other answer choices are incorrect because valve 3 is likely for a different purpose, valve 7 may be for a separate system, and valve 37 does not correspond to the specific valve that must be opened in this flooding scenario on the DEEP DRILLER.
Related Questions
#4298 What should be done after repairing a surface crack on a link of anchor chain by grinding? #4299 Prior to magnetic particle inspection of anchor chain, the chain should be _______________.#4301 When taking soundings on a MODU, coating the tape with chalk helps to _______________.#4302 The DEEP DRILLER is loaded as shown in Sample Load Form #4 (Drilling). While the unit is deballasting, starboard valve 17 fails in the closed position. You may deballast from tank 8S by pumping from tank 9S and opening valves 18 and _______________. #4303 When taking soundings on a floating MODU, the tape should be lowered and brought back quickly to _______________.