Question 2260Deck Safety70% to pass

You are loading in a port subject to the tropical load line mark and bound for a port subject to the winter load line mark. You will enter the summer zone after steaming eleven days, and you will enter the winter zone after a total of fourteen days. You will consume 36 tons of fuel, water, and stores per day. The hydrometer reading at the loading pier is 1.025, and the average TPI is 51. What is the minimum freeboard required at the start of the voyage? Reference Table BL-0006 below.

Diagram for question 2260
AI Explanation
The correct answer is B) 81.0 inches. To determine the minimum freeboard required at the start of the voyage, we need to refer to Table BL-0006 in the regulations. Since the vessel is loading in a port subject to the tropical load line mark and bound for a port subject to the winter load line mark, the minimum freeboard must be calculated based on the winter load line. According to the table, the minimum freeboard for a vessel with a hydrometer reading of 1.025 and an average TPI of 51 in the winter zone is 81.0 inches. The other options are incorrect because they do not match the minimum freeboard requirement specified in the table for the given conditions.

Related Questions

#2258 You are loading in a port subject to the tropical load line mark and bound for a port subject to the winter load line mark. You will enter the summer zone after steaming eight days, and you will enter the winter zone after a total of ten days. You will consume 31 tons of fuel, water, and stores per day. The hydrometer reading at the loading pier is 1.016, and the average TPI is 41. What is the minimum freeboard required at the start of the voyage? Reference Table BL-0015 below. #2259 You are loading in a port subject to the tropical load line mark and bound for a port subject to the winter load line mark. You will enter the summer zone after steaming four days, and you will enter the winter zone after a total of nine days. You will consume 29 tons of fuel, water, and stores per day. The hydrometer reading at the loading pier is 1.008, and the average TPI is 53. What is the minimum freeboard required at the start of the voyage? Reference Table BL-0016 below. #2261 You are loading in a port subject to the winter load line mark and bound for a port subject to the tropical load line mark. You will enter the summer zone after steaming four days, and you will enter the tropical zone after a total of seven days. You will consume 38 tons of fuel, water, and stores per day. The hydrometer reading at the loading pier is 1.004, and the average TPI is 72. What is the minimum freeboard required at the start of the voyage? Reference Table BL-0007 below. #2262 You are loading in a port subject to the tropical load line mark and bound for a port subject to the winter load line mark. You will enter the summer zone after steaming one day, and you will enter the winter zone after a total of eight days. You will consume 36 tons of fuel, water, and stores per day. The hydrometer reading at the loading pier is 1.002, and the TPI is 47. What is the minimum freeboard required at the start of the voyage? Reference Table BL-0005 below. #2263 You are loading in a port subject to the tropical load line mark and bound for a port subject to the winter load line mark. You will enter the summer zone after steaming one and one-half days, and you will enter the winter zone after a total of six days. You will consume 29 tons of fuel, water, and stores per day. The hydrometer reading at the loading pier is 1.006, and the average TPI is 43. What is the minimum freeboard required at the start of the voyage? Reference Table BL-0008 below.

Ready to test your knowledge?